New Step by Step Map For Brick Paver installation
Lay the base. Add not more than six inches (15.2 cm) at any given time to the complete excavated spot, and after that compact using a hand tamper (for very small assignments) or simply a mechanical plate compactor. It is really important that the base be perfectly-compacted. Repeat this process until finally you do have a base of the correct depth